NET December.
Falcon Heavy · Lunar Exploration

Demonstration flight of the Astrobotic Griffin lander and its engines, initially contracted for the cancelled NASA VIPER (Volatiles Investigating Polar Exploration Rover) mission. The vacated payload spot will now host the FLIP (FLEX Lunar Innovation Platform) lunar rover from Astrolab.
A verified event timeline has not been published for this mission.
Activity appears when ORBITAL observes a change between source records. No historical events are invented.
NET December.
NET November.
NET H2 2026.
NET July 2026
NET 2026.
NET December.
NET November 2025.
VIPER cancelled, but launch of the lander still scheduled for fall 2025
NET 2025.
Mission delayed due to NASA's request for additional lander tests
No changes recorded
Changes are recorded when ORBITAL retrieves data. The detection time may differ from the time the source changed its information.
The Falcon Heavy is a variant of the Falcon 9 full thrust launch vehicle and consists of a standard Falcon 9 rocket core, with two additional boosters derived from the Falcon 9 first stage.
Griffin Mission One
Payload details are described in the mission overview. No independently structured payload manifest or payload mass has been provided by the source.
Launch Complex 39A
Kennedy Space Center, FL, USA
No verified official livestream has been announced. Check mission sources for coverage updates.
Source links and confidence are preserved with each mission. Official updates take priority when verified.
Mission photographs are provided by the original sources. Their rights remain with their creators; consult the source before reusing an image.