Reverted back to NET 2026 due to launch vehicle testing delays.
RFA One · Test Flight

First flight of the RFA One launch vehicle. Will carry 7 satellites for various companies and organizations coordinated by the German Aerospace Center (DLR). * AllBertEinStein * ARTICA * Curium Two * ERMINAZ * PCIOD * Separation Ring Mission * SpaceDREAM
A verified event timeline has not been published for this mission.
Activity appears when ORBITAL observes a change between source records. No historical events are invented.
Reverted back to NET 2026 due to launch vehicle testing delays.
NET August.
NET summer 2026.
NET Q4 2025.
NET Q3 2025.
NET 2025 following the loss of the original maiden flight first stage in a static fire test anomaly.
Likely delayed due to the loss of the first stage during a static fire test.
NET 2H 2024.
NET Q2 2024
No changes recorded
Changes are recorded when ORBITAL retrieves data. The detection time may differ from the time the source changed its information.
RFA One is a three-stage rocket designed to launch small satellites and payloads of initially up to 1,350 kg into polar orbits.
Maiden Flight
Payload details are described in the mission overview. No independently structured payload manifest or payload mass has been provided by the source.
Launch Pad Fredo
SaxaVord Spaceport
No verified official livestream has been announced. Check mission sources for coverage updates.
Source links and confidence are preserved with each mission. Official updates take priority when verified.
Mission photographs are provided by the original sources. Their rights remain with their creators; consult the source before reusing an image.